Current Incidents

All systems running without issues.

Recently resolved

Maintenance on Panelbox s007 completed

The filesystem check has completed and all services are up and running.
Thank you for your patience and please contact us if you have any questions.

Emergency maintenance on Panelbox s007

The filesystem checks have been completed. The server and services are coming back online. We will continue monitoring this server closely in the hours and days to come.
Please do not hesitate to contact us if you have any questions

10 Gbps with TATA Communications activated

A 10 gig circuit with TATA Communications have been activated this morning. We now have 42 Gbps total bandwidth capacity. 1 Gbps Tiscali will be activated this month. The local loop is already in our building. Two Cogent uplinks will be upgraded to 10gig shortly. If you see any network discrepancies, please open a [...]

Fiber cut in Montreal affecting MTO Telecom and two TATA circuits

There has been a major fiber cut with MTO Telecom in downtown Montreal on last Friday afternoon. Two circuits with TATA Communications were down and were only restored on Sunday. Since we have excessive bandwidth capacity, the traffic were simply rerouted to other uplinks and we did not experience any slow down.

Intermitent unavailability on some Panelbox servers

We are currently experiencing intermitent unavailability on some Panelbox servers
We will post more informations as our investigation continue.
Update: The servers load are comming back to normal. All services are currently back operationnal. Please do not hesitate to contact us if you have any questions.

Two 10 Gig Videotron uplinks added

Two 10 Gbps circuits have been activated with Videotron today. Next week, we will activate a 10 Gbps circuit with TATA Communications (ex-Teleglobe). 1 Gbps with Tiscali will be added in November. Our Ile-des-Soeurs datacenter (iWeb-CO) should be Cogent on-net also by the next month. If you see any network discrepancies, please open a [...]

iWeb-CL Air Conditioning Maintenance Completed

The Air Conditioning Maintenance is now completed. Everything went well as planned and no side effects have been noted.

Panelbox Maintenance Completed

The storage maintenance has completed with heavier distruption on s010, s011 and s013. The other Panelbox Servers experienced briefs interruptions in a 20-30 minutes period. Thank you for your patience and cooperation during this maintenance.

CL-R4 10 Gig Uplinks Maintenance Completed

The maintenance has been completed successfully without problem.

Maintenance completed: CL-R5 10 gig uplinks

The maintenance has been completed successfully. We will proceed for the same maintenance on the other router, CL-R4, next week.

About the iWeb blog

The iWeb Blog covers web hosting, web development, web design, Internet marketing, and also exhaustive announcements from iWeb.

System Status

Details